폐열회수설비
HRSG 후단 폐열회수설비(개선공사) | |||
---|---|---|---|
GS Power / anyang | DKME | 500MW x 1st x 4기 | 2005. 05 |
GS Power / anyang | S/H ENG | 500MW x 2nd x 3기 | 2014. 01 |
GS Power / bucheon | S/H ENG | 450MW x 2nd x 3기 | 2015. 10 |
Korea Seast-East Power / bundang | Soo/k | 922MW x 1st x 8기 | 2006.10 |
Korea Western Power / ilsan | Soo/k | 900MW x 1st x 5기 | 2009.11 |